NEW QUESTION 11
Excessive working of the surface with a power grinder can be detrimental because excessive burnishing
- A. damages structural elements thereby speeding up the corrosion process.
- B. develops a good anchor profile resulting in uneven coating application.
- C. scratches the surface too deeply resulting in uneven coating application
- D. develops a polished surface, which is a poor anchor profile for most coatings
Answer: D
NEW QUESTION 12
When using a sling physchrometer a very large difference between the wet and dry bulb readings indicates:
- A. Low Surface Temperature
- B. Low Relative Humidity
- C. High Surface Temperature
- D. High Relative Humidity
Answer: B
NEW QUESTION 13
The NACE Inspector should perform tests for soluble salts:
- A. After surface preparation
- B. Prior to surface preparation
- C. When specified
- D. Prior to coating application
Answer: C
NEW QUESTION 14
An Inspector should change position when:
- A. The Inspector is convinced by verifiable facts
- B. The Owner can save some money by the change
- C. Only when directed by the supervisor
- D. The Inspectors position is not the majority position
Answer: A
NEW QUESTION 15
Whenever dissimilar metals must join, the most common practice is to
- A. provide cathodic protection to prevent corrosion,
- B. coat all connected dissimilar metals.
- C. avoid coating all connected dissimilar metals.
- D. provide anodic protection to prevent corrosion.
Answer: B
NEW QUESTION 16
Prior to the pre-job conference you notice that the Inspection and Test Plan does not require a hold point after surface preparation and coating application. In speaking with the owners' representative in advance of the meeting you sense he/she does not understand the importance of the hold point.
As a NACE CIP Level 1 Inspector your preferred course of action is to:
- A. Gather data and attempt to meet with the owner's representative in advance of the pre-job conference
- B. Meet separately with the coating manufactures' representative and coating application company in advance of the pre-job conference
- C. Default to the owner's Inspection and Test Plan
- D. Bring the matter up at the pre-job conference
Answer: D
NEW QUESTION 17
Which one of the following documents is the best source for coating technical data:
- A. Application Guidelines
- B. Specification
- C. Safety Data Sheet;
- D. Technical Data Sheet
Answer: D
NEW QUESTION 18
In the event of a conflict between the project specification and the coating manufactures' product data sheet, the Inspector's first course of action should be too:
- A. Call the person who wrote the specification for clarification
- B. Use the job specification as a guide
- C. Call the coating manufacturer for clarification
- D. Use the product data sheet as a guide
Answer: B
NEW QUESTION 19
Which one of these elements is not necessary for corrosion to occur:
- A. Anode
- B. Electrolyte
- C. Reference Cell
- D. Cathode
Answer: C
NEW QUESTION 20
Good records can provide maintenance departments with detailed information about ALL of the following EXCEPT
- A. when the coating will be reapplied.
- B. how the item was coated.
- C. what materials were used.
- D. what items were coated.
Answer: B
NEW QUESTION 21
You are an inspector on a project where SSPC SP 3 is specified.
What sort of tools should you expect the Contractor to use to achieve the standard?
- A. Abrasive blast nozzles
- B. Hand tools
- C. Airless spray equipment
- D. Power tools
Answer: D
NEW QUESTION 22
If the specifier does not identify a restriction level in accordance with SSPC PA 2, the default restriction level is:
- A. Level 3
- B. Level 1
- C. Level 2
- D. Level 4
Answer: A
NEW QUESTION 23
NACE No. 4/SSPC-SP-7 is a joint standard for
- A. brush-off blast cleaning.
- B. commercial blast cleaning.
- C. white metal blast cleaning.
- D. near-white metal blast cleaning.
Answer: A
NEW QUESTION 24
Using SSPC Vis 1 as a guide when performing a visual inspection of a steel surface prior to surface preparation a NACE Inspector would assign which designations to the surface condition:
- A. Surface Condition H
- B. Rust Grades A-D
- C. Surface Conditions E-G
- D. Rust Grades 1-4
Answer: B
NEW QUESTION 25
According to SSPC PA 2 a Spot Measurement is:
- A. The overall average of all readings
- B. A single gauge reading
- C. The average of gauge readings taken in a 4cm (1.5 inch) circle
- D. The average of all spot measurements in a given area
Answer: C
NEW QUESTION 26
......
Learn how to register for NACE CIP1-001 Certification.
The candidate must visit the official website of the NACE CIP1-001 exam. You need to provide all the required details in the application form. You will receive an email from us after filling the registration form. We will send you the NACE CIP1-001 examination kit. You can easily download the NACE CIP1-001 exam dumps to prepare for the NACE CIP1-001 exam.
Test Engine to Practice NACE-CIP1-001 Test Questions: https://www.exam-killer.com/NACE-CIP1-001-valid-questions.html
Use Valid NACE-CIP1-001 Exam - Actual Exam Question & Answer: https://drive.google.com/open?id=1F7rBxs60uN8sH8QbzZ8G_UqF5BfgYaf3