ISO-IEC-27005-Risk-Manager Dumps Updated Nov 02, 2024 Practice Test and 62 unique questions
2024 Latest 100% Exam Passing Ratio - ISO-IEC-27005-Risk-Manager Dumps PDF
PECB ISO-IEC-27005-Risk-Manager Exam Syllabus Topics:
| Topic | Details |
|---|---|
| Topic 1 |
|
| Topic 2 |
|
| Topic 3 |
|
NEW QUESTION # 18
Scenario 6: Productscape is a market research company headquartered in Brussels, Belgium. It helps organizations understand the needs and expectations of their customers and identify new business opportunities. Productscape's teams have extensive experience in marketing and business strategy and work with some of the best-known organizations in Europe. The industry in which Productscape operates requires effective risk management. Considering that Productscape has access to clients' confidential information, it is responsible for ensuring its security. As such, the company conducts regular risk assessments. The top management appointed Alex as the risk manager, who is responsible for monitoring the risk management process and treating information security risks.
The last risk assessment conducted was focused on information assets. The purpose of this risk assessment was to identify information security risks, understand their level, and take appropriate action to treat them in order to ensure the security of their systems. Alex established a team of three members to perform the risk assessment activities. Each team member was responsible for specific departments included in the risk assessment scope. The risk assessment provided valuable information to identify, understand, and mitigate the risks that Productscape faces.
Initially, the team identified potential risks based on the risk identification results. Prior to analyzing the identified risks, the risk acceptance criteria were established. The criteria for accepting the risks were determined based on Productscape's objectives, operations, and technology. The team created various risk scenarios and determined the likelihood of occurrence as "low," "medium," or "high." They decided that if the likelihood of occurrence for a risk scenario is determined as "low," no further action would be taken. On the other hand, if the likelihood of occurrence for a risk scenario is determined as "high" or "medium," additional controls will be implemented. Some information security risk scenarios defined by Productscape's team were as follows:
1. A cyber attacker exploits a security misconfiguration vulnerability of Productscape's website to launch an attack, which, in turn, could make the website unavailable to users.
2. A cyber attacker gains access to confidential information of clients and may threaten to make the information publicly available unless a ransom is paid.
3. An internal employee clicks on a link embedded in an email that redirects them to an unsecured website, installing a malware on the device.
The likelihood of occurrence for the first risk scenario was determined as "medium." One of the main reasons that such a risk could occur was the usage of default accounts and password. Attackers could exploit this vulnerability and launch a brute-force attack. Therefore, Productscape decided to start using an automated "build and deploy" process which would test the software on deploy and minimize the likelihood of such an incident from happening. However, the team made it clear that the implementation of this process would not eliminate the risk completely and that there was still a low possibility for this risk to occur. Productscape documented the remaining risk and decided to monitor it for changes.
The likelihood of occurrence for the second risk scenario was determined as "medium." Productscape decided to contract an IT company that would provide technical assistance and monitor the company's systems and networks in order to prevent such incidents from happening.
The likelihood of occurrence for the third risk scenario was determined as "high." Thus, Productscape decided to include phishing as a topic on their information security training sessions. In addition, Alex reviewed the controls of Annex A of ISO/IEC 27001 in order to determine the necessary controls for treating this risk. Alex decided to implement control A.8.23 Web filtering which would help the company to reduce the risk of accessing unsecure websites. Although security controls were implemented to treat the risk, the level of the residual risk still did not meet the risk acceptance criteria defined in the beginning of the risk assessment process. Since the cost of implementing additional controls was too high for the company, Productscape decided to accept the residual risk. Therefore, risk owners were assigned the responsibility of managing the residual risk.
Which risk treatment option was used for the second risk scenario? Refer to scenario 6.
- A. Risk retention
- B. Risk avoidance
- C. Risk sharing
Answer: C
Explanation:
Risk sharing, also known as risk transfer, involves sharing the risk with another party, such as through insurance or outsourcing certain activities to third-party vendors. In Scenario 6, Productscape decided to contract an IT company to provide technical assistance and monitor the company's systems and networks to prevent incidents related to the second risk scenario (gaining access to confidential information and threatening to make it public unless a ransom is paid). This is an example of risk sharing because Productscape transferred part of the risk management responsibilities to an external company. Thus, the correct answer is C, Risk sharing.
Reference:
ISO/IEC 27005:2018, Clause 8.6, "Risk Treatment," which includes risk sharing as an option where a third party is used to manage specific risks.
NEW QUESTION # 19
Scenario 1
The risk assessment process was led by Henry, Bontton's risk manager. The first step that Henry took was identifying the company's assets. Afterward, Henry created various potential incident scenarios. One of the main concerns regarding the use of the application was the possibility of being targeted by cyber attackers, as a great number of organizations were experiencing cyberattacks during that time. After analyzing the identified risks, Henry evaluated them and concluded that new controls must be implemented if the company wants to use the application. Among others, he stated that training should be provided to personnel regarding the use of the application and that awareness sessions should be conducted regarding the importance of protecting customers' personal data.
Lastly, Henry communicated the risk assessment results to the top management. They decided that the application will be used only after treating the identified risks.
Henry concluded that one of the main concerns regarding the use of the application for online ordering was cyberattacks. What did Henry identify in this case? Refer to scenario 1.\
- A. A threat
- B. The vulnerabilities of an asset
- C. The consequences of a potential security incident
Answer: A
Explanation:
In this scenario, Henry identifies "cyberattacks" as one of the main concerns related to the use of the application for online ordering. According to ISO/IEC 27005, a "threat" is any potential cause of an unwanted incident that may result in harm to a system or organization. In this context, cyberattacks are considered a threat because they represent a potential cause that could compromise the security of the application. Henry's identification of cyberattacks as a primary concern aligns with recognizing a specific threat that could exploit vulnerabilities within the system.
Reference:
ISO/IEC 27005:2018, Clause 8.3, "Threat identification," which provides guidance on identifying threats that could affect the organization's information assets.
ISO/IEC 27001:2013, Clause 6.1.2, "Information Security Risk Assessment," where identifying threats is part of the risk assessment process.
These answers are verified based on the standards' definitions and guidelines, providing a comprehensive understanding of how ISO/IEC 27005 is used within the context of ISO/IEC 27001.
NEW QUESTION # 20
After creating a plan for outsourcing to a cloud service provider to store their confidential information in cloud, OrgX decided to not pursue this business strategy since the risk of doing so was high. Which risk treatment option did OrgX use?
- A. Risk sharing
- B. Risk modification
- C. Risk avoidance
Answer: C
Explanation:
OrgX decided not to pursue a business strategy involving outsourcing to a cloud service provider due to the high risk. This decision reflects a "risk avoidance" strategy, where the organization chooses not to engage in an activity that poses unacceptable risks. This aligns with option A.
NEW QUESTION # 21
Scenario 5: Detika is a private cardiology clinic in Pennsylvania, the US. Detika has one of the most advanced healthcare systems for treating heart diseases. The clinic uses sophisticated apparatus that detects heart diseases in early stages. Since 2010, medical information of Detika's patients is stored on the organization's digital systems. Electronic health records (EHR), among others, include patients' diagnosis, treatment plan, and laboratory results.
Storing and accessing patient and other medical data digitally was a huge and a risky step for Detik a. Considering the sensitivity of information stored in their systems, Detika conducts regular risk assessments to ensure that all information security risks are identified and managed. Last month, Detika conducted a risk assessment which was focused on the EHR system. During risk identification, the IT team found out that some employees were not updating the operating systems regularly. This could cause major problems such as a data breach or loss of software compatibility. In addition, the IT team tested the software and detected a flaw in one of the software modules used. Both issues were reported to the top management and they decided to implement appropriate controls for treating the identified risks. They decided to organize training sessions for all employees in order to make them aware of the importance of the system updates. In addition, the manager of the IT Department was appointed as the person responsible for ensuring that the software is regularly tested.
Another risk identified during the risk assessment was the risk of a potential ransomware attack. This risk was defined as low because all their data was backed up daily. The IT team decided to accept the actual risk of ransomware attacks and concluded that additional measures were not required. This decision was documented in the risk treatment plan and communicated to the risk owner. The risk owner approved the risk treatment plan and documented the risk assessment results.
Following that, Detika initiated the implementation of new controls. In addition, one of the employees of the IT Department was assigned the responsibility for monitoring the implementation process and ensure the effectiveness of the security controls. The IT team, on the other hand, was responsible for allocating the resources needed to effectively implement the new controls.
How should Detika define which of the identified risks should be treated first? Refer to scenario 5.
- A. Based on who is accountable and responsible for approving the risk treatment plan
- B. Based on the resources required for ensuring effective implementation
- C. Based on their priority in the risk treatment plan
Answer: C
Explanation:
Detika should prioritize the treatment of identified risks based on their priority in the risk treatment plan. According to ISO/IEC 27005, the risk treatment plan specifies the order in which risks should be treated based on their severity, likelihood, and impact on the organization. Risks that pose the greatest threat to the organization or have the highest priority should be treated first. Options B and C are incorrect because allocating resources or determining accountability do not inherently establish the priority of risk treatment; the risk treatment plan does.
NEW QUESTION # 22
Scenario 4: In 2017, seeing that millions of people turned to online shopping, Ed and James Cordon founded the online marketplace for footwear called Poshoe. In the past, purchasing pre-owned designer shoes online was not a pleasant experience because of unattractive pictures and an inability to ascertain the products' authenticity. However, after Poshoe's establishment, each product was well advertised and certified as authentic before being offered to clients. This increased the customers' confidence and trust in Poshoe's products and services. Poshoe has approximately four million users and its mission is to dominate the second-hand sneaker market and become a multi-billion dollar company.
Due to the significant increase of daily online buyers, Poshoe's top management decided to adopt a big data analytics tool that could help the company effectively handle, store, and analyze dat a. Before initiating the implementation process, they decided to conduct a risk assessment. Initially, the company identified its assets, threats, and vulnerabilities associated with its information systems. In terms of assets, the company identified the information that was vital to the achievement of the organization's mission and objectives. During this phase, the company also detected a rootkit in their software, through which an attacker could remotely access Poshoe's systems and acquire sensitive data.
The company discovered that the rootkit had been installed by an attacker who had gained administrator access. As a result, the attacker was able to obtain the customers' personal data after they purchased a product from Poshoe. Luckily, the company was able to execute some scans from the target device and gain greater visibility into their software's settings in order to identify the vulnerability of the system.
The company initially used the qualitative risk analysis technique to assess the consequences and the likelihood and to determine the level of risk. The company defined the likelihood of risk as "a few times in two years with the probability of 1 to 3 times per year." Later, it was decided that they would use a quantitative risk analysis methodology since it would provide additional information on this major risk. Lastly, the top management decided to treat the risk immediately as it could expose the company to other issues. In addition, it was communicated to their employees that they should update, secure, and back up Poshoe's software in order to protect customers' personal information and prevent unauthorized access from attackers.
According to scenario 4, Poshoe has identified its assets, vulnerabilities, and threats associated with its information systems. What does the company need in order to start identifying its existing controls?
- A. A list of incident scenarios with their consequences
- B. The risk treatment implementation plan and documentation of controls
- C. A list of all existing and planned controls
Answer: C
Explanation:
To start identifying its existing controls, Poshoe needs a list of all existing and planned controls. This list will provide the necessary baseline to understand what security measures are already in place and what measures are planned to mitigate risks. This helps in determining gaps, evaluating the effectiveness of current controls, and identifying areas requiring improvement. Option A (The risk treatment implementation plan and documentation of controls) is incorrect because it is too specific and assumes a level of completion not indicated in the scenario. Option C (A list of incident scenarios with their consequences) is incorrect as it pertains to the analysis phase of risk management, not the identification of existing controls.
NEW QUESTION # 23
Scenario 7: Adstry is a business growth agency that specializes in digital marketing strategies. Adstry helps organizations redefine the relationships with their customers through innovative solutions. Adstry is headquartered in San Francisco and recently opened two new offices in New York. The structure of the company is organized into teams which are led by project managers. The project manager has the full power in any decision related to projects. The team members, on the other hand, report the project's progress to project managers.
Considering that data breaches and ad fraud are common threats in the current business environment, managing risks is essential for Adstry. When planning new projects, each project manager is responsible for ensuring that risks related to a particular project have been identified, assessed, and mitigated. This means that project managers have also the role of the risk manager in Adstry. Taking into account that Adstry heavily relies on technology to complete their projects, their risk assessment certainly involves identification of risks associated with the use of information technology. At the earliest stages of each project, the project manager communicates the risk assessment results to its team members.
Adstry uses a risk management software which helps the project team to detect new potential risks during each phase of the project. This way, team members are informed in a timely manner for the new potential risks and are able to respond to them accordingly. The project managers are responsible for ensuring that the information provided to the team members is communicated using an appropriate language so it can be understood by all of them.
In addition, the project manager may include external interested parties affected by the project in the risk communication. If the project manager decides to include interested parties, the risk communication is thoroughly prepared. The project manager firstly identifies the interested parties that should be informed and takes into account their concerns and possible conflicts that may arise due to risk communication. The risks are communicated to the identified interested parties while taking into consideration the confidentiality of Adstry's information and determining the level of detail that should be included in the risk communication. The project managers use the same risk management software for risk communication with external interested parties since it provides a consistent view of risks. For each project, the project manager arranges regular meetings with relevant interested parties of the project, they discuss the detected risks, their prioritization, and determine appropriate treatment solutions. The information taken from the risk management software and the results of these meetings are documented and are used for decision-making processes. In addition, the company uses a computerized documented information management system for the acquisition, classification, storage, and archiving of its documents.
Based on scenario 7, Adstry's project managers hold regular meetings with interested parties to discuss risks and risk treatment solutions. According to the guidelines of ISO/IEC 27005, is this in compliance with best practices?
- A. Yes, the coordination between project managers and relevant interested parties can be achieved by discussions upon risks and appropriate treatment solutions
- B. Yes, risks can be communicated to and discussed with relevant interested parties only if the project manager decides that it is appropriate to do so
- C. No, risk owners should not communicate or discuss risk treatment options with external interested parties
Answer: A
Explanation:
According to ISO/IEC 27005, effective risk management includes communication and consultation with relevant interested parties. Holding regular meetings to discuss risks, their prioritization, and appropriate treatment solutions is a good practice for ensuring that all parties are aware of the risks and involved in the decision-making process for risk treatment. This approach fosters coordination and collaboration, which is essential for managing risks effectively. Therefore, the practice of discussing risks and treatment options with relevant interested parties aligns with best practices, making option A the correct answer.
Reference:
ISO/IEC 27005:2018, Clause 7, "Communication and Consultation," which emphasizes the importance of communicating risks and consulting with relevant interested parties.
NEW QUESTION # 24
What should an organization do after it has established the risk communication plan?
- A. Change the communication approach and tools
- B. Update the information security policy
- C. Establish internal and external communication
Answer: C
Explanation:
Once an organization has established a risk communication plan, it should implement it by establishing both internal and external communication channels to ensure all stakeholders are informed and involved in the risk management process. This step is crucial for maintaining transparency, ensuring clarity, and fostering a collaborative environment where risks are managed effectively. Therefore, option C is the correct answer.
Reference:
ISO/IEC 27005:2018, Clause 7, "Communication and Consultation," which outlines the importance of establishing both internal and external communication mechanisms to ensure effective risk management.
NEW QUESTION # 25
Scenario 5: Detika is a private cardiology clinic in Pennsylvania, the US. Detika has one of the most advanced healthcare systems for treating heart diseases. The clinic uses sophisticated apparatus that detects heart diseases in early stages. Since 2010, medical information of Detika's patients is stored on the organization's digital systems. Electronic health records (EHR), among others, include patients' diagnosis, treatment plan, and laboratory results.
Storing and accessing patient and other medical data digitally was a huge and a risky step for Detik a. Considering the sensitivity of information stored in their systems, Detika conducts regular risk assessments to ensure that all information security risks are identified and managed. Last month, Detika conducted a risk assessment which was focused on the EHR system. During risk identification, the IT team found out that some employees were not updating the operating systems regularly. This could cause major problems such as a data breach or loss of software compatibility. In addition, the IT team tested the software and detected a flaw in one of the software modules used. Both issues were reported to the top management and they decided to implement appropriate controls for treating the identified risks. They decided to organize training sessions for all employees in order to make them aware of the importance of the system updates. In addition, the manager of the IT Department was appointed as the person responsible for ensuring that the software is regularly tested.
Another risk identified during the risk assessment was the risk of a potential ransomware attack. This risk was defined as low because all their data was backed up daily. The IT team decided to accept the actual risk of ransomware attacks and concluded that additional measures were not required. This decision was documented in the risk treatment plan and communicated to the risk owner. The risk owner approved the risk treatment plan and documented the risk assessment results.
Following that, Detika initiated the implementation of new controls. In addition, one of the employees of the IT Department was assigned the responsibility for monitoring the implementation process and ensure the effectiveness of the security controls. The IT team, on the other hand, was responsible for allocating the resources needed to effectively implement the new controls.
Based on scenario 5, which risk treatment option did Detika select to treat the risk of a potential ransomware attack?
- A. Risk sharing
- B. Risk avoidance
- C. Risk retention
Answer: C
Explanation:
Risk retention involves accepting the risk when its likelihood or impact is low, or when the cost of mitigating the risk is higher than the benefit. In the scenario, Detika decided to accept the risk of a potential ransomware attack because the data is backed up daily, and additional measures were deemed unnecessary. This decision aligns with the risk retention strategy, where an organization chooses to live with the risk rather than apply further controls. Option A is the correct answer.
Reference:
ISO/IEC 27005:2018, Clause 8.6, "Risk Treatment," which discusses risk retention as an option for managing risks deemed acceptable by the organization.
NEW QUESTION # 26
Scenario 7: Adstry is a business growth agency that specializes in digital marketing strategies. Adstry helps organizations redefine the relationships with their customers through innovative solutions. Adstry is headquartered in San Francisco and recently opened two new offices in New York. The structure of the company is organized into teams which are led by project managers. The project manager has the full power in any decision related to projects. The team members, on the other hand, report the project's progress to project managers.
Considering that data breaches and ad fraud are common threats in the current business environment, managing risks is essential for Adstry. When planning new projects, each project manager is responsible for ensuring that risks related to a particular project have been identified, assessed, and mitigated. This means that project managers have also the role of the risk manager in Adstry. Taking into account that Adstry heavily relies on technology to complete their projects, their risk assessment certainly involves identification of risks associated with the use of information technology. At the earliest stages of each project, the project manager communicates the risk assessment results to its team members.
Adstry uses a risk management software which helps the project team to detect new potential risks during each phase of the project. This way, team members are informed in a timely manner for the new potential risks and are able to respond to them accordingly. The project managers are responsible for ensuring that the information provided to the team members is communicated using an appropriate language so it can be understood by all of them.
In addition, the project manager may include external interested parties affected by the project in the risk communication. If the project manager decides to include interested parties, the risk communication is thoroughly prepared. The project manager firstly identifies the interested parties that should be informed and takes into account their concerns and possible conflicts that may arise due to risk communication. The risks are communicated to the identified interested parties while taking into consideration the confidentiality of Adstry's information and determining the level of detail that should be included in the risk communication. The project managers use the same risk management software for risk communication with external interested parties since it provides a consistent view of risks. For each project, the project manager arranges regular meetings with relevant interested parties of the project, they discuss the detected risks, their prioritization, and determine appropriate treatment solutions. The information taken from the risk management software and the results of these meetings are documented and are used for decision-making processes. In addition, the company uses a computerized documented information management system for the acquisition, classification, storage, and archiving of its documents.
Based on scenario 7, which principle of efficient communication strategy Adstry's project managers follow when communicating risks to team members?
- A. Responsiveness
- B. Credibility
- C. Clarity
Answer: C
Explanation:
Adstry's project managers focus on ensuring that the information provided to team members is communicated using an appropriate language that can be understood by all. This approach reflects the principle of clarity, which is a key element of an effective communication strategy. Clear communication helps to ensure that all parties understand the risks, their implications, and the necessary actions to mitigate them. Option B (Credibility) relates to trustworthiness, which is not the primary focus here, and Option C (Responsiveness) involves timely reactions, which is also not the main point of emphasis in this context.
NEW QUESTION # 27
Based on NIST Risk Management Framework, what is the last step of a risk management process?
- A. Monitoring security controls
- B. Communicating findings and recommendations
- C. Accessing security controls
Answer: A
Explanation:
Based on the NIST Risk Management Framework (RMF), the last step of the risk management process is "Monitoring Security Controls." This step involves continuously tracking the effectiveness of the implemented security controls, ensuring they remain effective against identified risks, and adapting them to any changes in the threat landscape. Option A correctly identifies the final step.
NEW QUESTION # 28
Scenario 5: Detika is a private cardiology clinic in Pennsylvania, the US. Detika has one of the most advanced healthcare systems for treating heart diseases. The clinic uses sophisticated apparatus that detects heart diseases in early stages. Since 2010, medical information of Detika's patients is stored on the organization's digital systems. Electronic health records (EHR), among others, include patients' diagnosis, treatment plan, and laboratory results.
Storing and accessing patient and other medical data digitally was a huge and a risky step for Detik a. Considering the sensitivity of information stored in their systems, Detika conducts regular risk assessments to ensure that all information security risks are identified and managed. Last month, Detika conducted a risk assessment which was focused on the EHR system. During risk identification, the IT team found out that some employees were not updating the operating systems regularly. This could cause major problems such as a data breach or loss of software compatibility. In addition, the IT team tested the software and detected a flaw in one of the software modules used. Both issues were reported to the top management and they decided to implement appropriate controls for treating the identified risks. They decided to organize training sessions for all employees in order to make them aware of the importance of the system updates. In addition, the manager of the IT Department was appointed as the person responsible for ensuring that the software is regularly tested.
Another risk identified during the risk assessment was the risk of a potential ransomware attack. This risk was defined as low because all their data was backed up daily. The IT team decided to accept the actual risk of ransomware attacks and concluded that additional measures were not required. This decision was documented in the risk treatment plan and communicated to the risk owner. The risk owner approved the risk treatment plan and documented the risk assessment results.
Following that, Detika initiated the implementation of new controls. In addition, one of the employees of the IT Department was assigned the responsibility for monitoring the implementation process and ensure the effectiveness of the security controls. The IT team, on the other hand, was responsible for allocating the resources needed to effectively implement the new controls.
Based on scenario 5, the IT team was responsible for allocating the necessary resources to ensure that the new controls are implemented effectively. Is this acceptable?
- A. No, the necessary resources for treating the risk should be allocated in the beginning of the risk assessment process
- B. No, the organization should allocate the necessary resources to ensure the effective implementation of the risk treatment plan
- C. Yes, the team that is responsible for conducting the risk assessment should ensure that the necessary resources for treating the risk are allocated
Answer: C
Explanation:
According to ISO/IEC 27005, the team responsible for the risk assessment is often tasked with coordinating the resources necessary to treat identified risks effectively. This includes ensuring that the resources required for implementing risk treatment actions, such as financial, technical, and human resources, are available and allocated appropriately. Option B is incorrect because it is not only the organization that allocates resources, but rather a combined effort involving the risk management team to ensure proper allocation. Option C is incorrect because resources must be managed and allocated continually throughout the risk management process, not just at the beginning.
NEW QUESTION # 29
Scenario 6: Productscape is a market research company headquartered in Brussels, Belgium. It helps organizations understand the needs and expectations of their customers and identify new business opportunities. Productscape's teams have extensive experience in marketing and business strategy and work with some of the best-known organizations in Europe. The industry in which Productscape operates requires effective risk management. Considering that Productscape has access to clients' confidential information, it is responsible for ensuring its security. As such, the company conducts regular risk assessments. The top management appointed Alex as the risk manager, who is responsible for monitoring the risk management process and treating information security risks.
The last risk assessment conducted was focused on information assets. The purpose of this risk assessment was to identify information security risks, understand their level, and take appropriate action to treat them in order to ensure the security of their systems. Alex established a team of three members to perform the risk assessment activities. Each team member was responsible for specific departments included in the risk assessment scope. The risk assessment provided valuable information to identify, understand, and mitigate the risks that Productscape faces.
Initially, the team identified potential risks based on the risk identification results. Prior to analyzing the identified risks, the risk acceptance criteria were established. The criteria for accepting the risks were determined based on Productscape's objectives, operations, and technology. The team created various risk scenarios and determined the likelihood of occurrence as "low," "medium," or "high." They decided that if the likelihood of occurrence for a risk scenario is determined as "low," no further action would be taken. On the other hand, if the likelihood of occurrence for a risk scenario is determined as "high" or "medium," additional controls will be implemented. Some information security risk scenarios defined by Productscape's team were as follows:
1. A cyber attacker exploits a security misconfiguration vulnerability of Productscape's website to launch an attack, which, in turn, could make the website unavailable to users.
2. A cyber attacker gains access to confidential information of clients and may threaten to make the information publicly available unless a ransom is paid.
3. An internal employee clicks on a link embedded in an email that redirects them to an unsecured website, installing a malware on the device.
The likelihood of occurrence for the first risk scenario was determined as "medium." One of the main reasons that such a risk could occur was the usage of default accounts and password. Attackers could exploit this vulnerability and launch a brute-force attack. Therefore, Productscape decided to start using an automated "build and deploy" process which would test the software on deploy and minimize the likelihood of such an incident from happening. However, the team made it clear that the implementation of this process would not eliminate the risk completely and that there was still a low possibility for this risk to occur. Productscape documented the remaining risk and decided to monitor it for changes.
The likelihood of occurrence for the second risk scenario was determined as "medium." Productscape decided to contract an IT company that would provide technical assistance and monitor the company's systems and networks in order to prevent such incidents from happening.
The likelihood of occurrence for the third risk scenario was determined as "high." Thus, Productscape decided to include phishing as a topic on their information security training sessions. In addition, Alex reviewed the controls of Annex A of ISO/IEC 27001 in order to determine the necessary controls for treating this risk. Alex decided to implement control A.8.23 Web filtering which would help the company to reduce the risk of accessing unsecure websites. Although security controls were implemented to treat the risk, the level of the residual risk still did not meet the risk acceptance criteria defined in the beginning of the risk assessment process. Since the cost of implementing additional controls was too high for the company, Productscape decided to accept the residual risk. Therefore, risk owners were assigned the responsibility of managing the residual risk.
Based on the scenario above, answer the following question:
Which risk treatment option was used for the first risk scenario?
- A. Risk modification
- B. Risk sharing
- C. Risk avoidance
Answer: A
Explanation:
Risk modification involves implementing measures to reduce the likelihood or impact of a risk. In the first risk scenario, Productscape decided to use an automated "build and deploy" process to reduce the likelihood of an attacker exploiting a security misconfiguration vulnerability. This action aims to lower the risk to an acceptable level, which is characteristic of risk modification. Option B (Risk avoidance) would involve eliminating the risk by avoiding the activity altogether, which is not what was done. Option C (Risk sharing) involves transferring some or all of the risk to a third party, which is not applicable in this scenario.
NEW QUESTION # 30
According to ISO 31000, which of the following is a principle of risk management?
- A. Dynamic
- B. Reliability
- C. Qualitative
Answer: A
Explanation:
According to ISO 31000, a principle of risk management is that it should be dynamic. This means that risk management practices should be flexible and able to adapt to changes in the internal and external environment of the organization. Risks are constantly evolving due to changes in technology, regulatory requirements, market conditions, and other factors, and risk management must be capable of responding to these changes. Option A is correct because it aligns with this principle. Option B (Qualitative) refers to a method for assessing risk rather than a principle of risk management, and Option C (Reliability) is not listed as a principle in ISO 31000.
NEW QUESTION # 31
According to ISO/IEC 27005, what is the input when selecting information security risk treatment options?
- A. A risk treatment plan and residual risks subject to the acceptance decision
- B. A list of prioritized risks with event or risk scenarios that lead to those risks
- C. A list of risks with level values assigned
Answer: B
Explanation:
According to ISO/IEC 27005, the input for selecting information security risk treatment options should include a list of prioritized risks along with the specific event or risk scenarios that led to those risks. This information helps decision-makers understand the context and potential impact of each risk, allowing them to choose the most appropriate treatment options. Option A is incorrect because the risk treatment plan and residual risks are outputs, not inputs, of the risk treatment process. Option C is incorrect because a list of risks with level values assigned provides limited context for selecting appropriate treatment options.
NEW QUESTION # 32
Scenario 3: Printary is an American company that offers digital printing services. Creating cost-effective and creative products, the company has been part of the printing industry for more than 30 years. Three years ago, the company started to operate online, providing greater flexibility for its clients. Through the website, clients could find information about all services offered by Printary and order personalized products. However, operating online increased the risk of cyber threats, consequently, impacting the business functions of the company. Thus, along with the decision of creating an online business, the company focused on managing information security risks. Their risk management program was established based on ISO/IEC 27005 guidelines and industry best practices.
Last year, the company considered the integration of an online payment system on its website in order to provide more flexibility and transparency to customers. Printary analyzed various available solutions and selected Pay0, a payment processing solution that allows any company to easily collect payments on their website. Before making the decision, Printary conducted a risk assessment to identify and analyze information security risks associated with the software. The risk assessment process involved three phases: identification, analysis, and evaluation. During risk identification, the company inspected assets, threats, and vulnerabilities. In addition, to identify the information security risks, Printary used a list of the identified events that could negatively affect the achievement of information security objectives. The risk identification phase highlighted two main threats associated with the online payment system: error in use and data corruption After conducting a gap analysis, the company concluded that the existing security controls were sufficient to mitigate the threat of data corruption. However, the user interface of the payment solution was complicated, which could increase the risk associated with user errors, and, as a result, impact data integrity and confidentiality.
Subsequently, the risk identification results were analyzed. The company conducted risk analysis in order to understand the nature of the identified risks. They decided to use a quantitative risk analysis methodology because it would provide more detailed information. The selected risk analysis methodology was consistent with the risk evaluation criteri a. Firstly, they used a list of potential incident scenarios to assess their potential impact. In addition, the likelihood of incident scenarios was defined and assessed. Finally, the level of risk was defined as low.
In the end, the level of risk was compared to the risk evaluation and acceptance criteria and was prioritized accordingly.
Based on scenario 3, Printary used a list of identified events that could negatively influence the achievement of its information security objectives to identify information security risks. Is this in compliance with the guidelines of ISO/IEC 27005?
- A. No, a list of risk scenarios with their consequences related to assets or events and their likelihood should be used to identity information security risks
- B. Yes, a list of events that can negatively influence the achievement of information security objectives in the company should be used to identity information security risks
- C. No. a list of risk sources, business processes. and business objectives should be used to identify information security risks
Answer: B
Explanation:
According to ISO/IEC 27005, identifying risks to information security involves recognizing events that could adversely affect the achievement of information security objectives. Using a list of events that could negatively impact these objectives is consistent with the risk identification process as outlined in ISO/IEC 27005. This approach focuses on identifying specific incidents or events that could result in security breaches or compromises, providing a clear understanding of the potential risks to the organization. Thus, Printary's use of a list of such events to identify information security risks complies with the standard's guidelines, making option B the correct answer.
Reference:
ISO/IEC 27005:2018, Clause 8.2, "Risk Identification," which states that the organization should identify the events that could compromise information security objectives.
NEW QUESTION # 33
......
Verified ISO-IEC-27005-Risk-Manager dumps Q&As - 100% Pass from Exam-Killer: https://www.exam-killer.com/ISO-IEC-27005-Risk-Manager-valid-questions.html
Pass Exam With Full Sureness - ISO-IEC-27005-Risk-Manager Dumps with 62 Questions: https://drive.google.com/open?id=1choX2mJ8sVb8fYlrlbYZOsWI_5O-YddC