Clear your concepts with C-TS422-2021 Questions Before Attempting Real exam [Q12-Q31]

Share

Clear your concepts with C-TS422-2021 Questions Before Attempting Real exam

Get professional help from our C-TS422-2021 Dumps PDF


C-TS422-2021 Exam Certification Details:

Duration:180 mins
Level:Associate
Exam:80 questions
Sample Questions: SAP C-TS422-2021 Exam Sample Question
Languages:German, English, Japanese, Chinese

 

NEW QUESTION 12
What is the purpose of collective orders?

  • A. To post any component withdrawal as single backflush with order confiramtion
  • B. To manage production orders for an entire finished product on multiple levels
  • C. To combine order management of co-products any by-products with the main product.
  • D. To post production costs on a cost collector instead of the production order

Answer: B

 

NEW QUESTION 13
What does it mean for the production planner when MRP works with infinite capacities?

  • A. MRP creates capacity requirements without checking the capacity of a work center.
  • B. MRP creates capacity requirements only if the work center has sufficient capacity.
  • C. MRP assigns capacity requirements automatically to work center is with the earliest available capacity.
  • D. MRP assigns capacity requirements automatically after the last scheduled order on a work center.

Answer: A

 

NEW QUESTION 14
Which time elements are relevant for lead time scheduling of a production order?

  • A. Setup time
  • B. Total replenishment lead time
  • C. Float after production
  • D. Planned delivery time

Answer: C,D

 

NEW QUESTION 15
Where do you maintain data to determine the duration of an operation for production?

  • A. Material master
  • B. Routing
  • C. Bill of material (BOM)
  • D. Work center

Answer: B,D

 

NEW QUESTION 16
Which of the following elements does MRP take into account during net requirement calculation?

  • A. Safety stock
  • B. Maximum stock level
  • C. Purchase orders
  • D. Lot size

Answer: A,D

 

NEW QUESTION 17
You need to model goods receipt processing time in detailed scheduling. Whic modeling options do you have?

  • A. Model a resource inbound in the location master.
  • B. Model a seperate resource in the production data structure.
  • C. Model a handling resource in the location master and goods receipt time in the material master.
  • D. Model a transportation resorce in the location master.

Answer: C,D

 

NEW QUESTION 18
When working with bouth cross-plant and plant-specific material statuses n the material master, which statuses has the higest priority?

  • A. The last restrictive status
  • B. The cross-plant status
  • C. The most restrictive status
  • D. The plant-specific status

Answer: C

 

NEW QUESTION 19
You are working with planning strategy 40 (Planning-with-final assembly) When does consuption of planned independent requirements take places?

  • A. When the MRP result are saved
  • B. When you create a planned order
  • C. When you create a sales order
  • D. When you deliver a sales order

Answer: C

 

NEW QUESTION 20
How would you define pegging in the context of Advanced Planning?

  • A. An evaluation to verify if there are material or capacity shortages in the network after the production planning run.
  • B. An evaluation to verify if there are overstock situations in the balance between receipt and issue elements after the production planning run
  • C. An evaluation that is ordered according to the network structure of all related products and represents the coverage of issue elements
  • D. An evaluation that is ordered according to the bill-of-material structure of all related products and represents the relationship between the receipt and the issue elements

Answer: D

 

NEW QUESTION 21
Which alternative item strategies are available in bills of materials (BOM) in SAP S/4HANA?

  • A. By usage probability
  • B. First in first out (FIFO)
  • C. 100% check
  • D. Simultaneous

Answer: A,C

 

NEW QUESTION 22
How can you set up the supply source for the Kanban process in SAP S/4HANA?

  • A. Using purchasing costs for automated source prioritization
  • B. Using quotations for internal and external procurement
  • C. Using purchase orders for external procurement
  • D. Using stock transfer reservations for stock transfer
  • E. Using run schedule quantities for in-house production

Answer: C,D,E

 

NEW QUESTION 23
What does forecasting in demand planning cycle include?

  • A. Past sales order quantites
  • B. Market intelligence
  • C. Past quotation quantities
  • D. One-off events
  • E. Past procurment quantities

Answer: A,B,D

 

NEW QUESTION 24
Which options do you have to plan both quant ties and capacities during line loading in repetitive manufacturing?

  • A. Run PP/DS heuristics for repetitive manufacturing.
  • B. Run MRP with automatic selection of production version.
  • C. Run MRP with quota arrangement.
  • D. Assign planned orders manual lying the planning table.

Answer: A,C

 

NEW QUESTION 25
What happens to this dependent requirement when you convert the planned order into a production order?

  • A. They are converted into a schedule line.
  • B. They are converted into a reservation.
  • C. They are converted into a production order.
  • D. They are converted into a planned order.

Answer: B

 

NEW QUESTION 26
Mode selection is one of the scheduling options available in Advanced Planning in SAP S/4HANA. When can you use mode selection?

  • A. When multiple production versions are maintained for one product
  • B. When alternate resources are used within one operation
  • C. When multiple operations are maintained for one product
  • D. When multiple planned orders exist on one resource

Answer: B

 

NEW QUESTION 27
Your company produces a finished good based on a forecast and expects it to being stock when customers order it. If customers order more than the forecasted quantity, the production quantity should be increased to try to meet the extra demand. Which planning strategy do you use?

  • A. Make-to-stock production (10)
  • B. Planning without final assembly (50)
  • C. Planning with final assembly (40)
  • D. Make-to-order production (20)

Answer: C

 

NEW QUESTION 28
Your client is asking for your advice on material master numbering in SAP S/4HANA. What do you need to consider?

  • A. The maximum mater all number length is 40 for external numbers and 18 for internal numbers
  • B. The display template for material numbers applies to all clients.
  • C. The number of leading zeros for internal numbers is client-specific.
  • D. In Customizing you can decide by material type whether to use the long material number.

Answer: A,B

 

NEW QUESTION 29
What are some uses for the low-level code assigned to each material?

  • A. It is used by product costing to determine how coast are rolled up.
  • B. it is used by ATP to determine the priority of alternative components.
  • C. It is used by engineering to indentify subitems in an engineering bill of material (BOM).
  • D. It is used in MRP to determine the sequence in which materials are planned.

Answer: A,D

 

NEW QUESTION 30
Which actions does the system preform by default when you save a confirmation for a finished product in repetitive manufacturing?

  • A. Posting of production costs to the production cost collector
  • B. Material staging for nex order in sequence
  • C. Posting of goods receipt for the product
  • D. Reduction of associated capacity requirements
  • E. Archiving of documents for assembly scrap

Answer: A,C,D

 

NEW QUESTION 31
......


SAP C-TS422-2021 Certification Exam Topics:

Topic AreasTopic Details, Courses, Books
Lean Manufacturing in SAP S/4HANA 8% - 12%

Identify repetitive manufacturing specific master data, explain line load planning and confirmation, outline Kanban master data and Kanban processes.

Material Requirements Planning in SAP S/4HANA 8% - 12%

Select and apply planning strategies, use the planning table, characterize long-term planning and master production scheduling, outline MRP basics and steps of MRP, and describe lot size procedures.

Advanced Planning in SAP S/4HANA > 12%

Outline the basics and master data of advanced planning,  explain tools (alert monitor, detailed scheduling planning board) and advanced planning and detailed scheduling processes, explain planning evaluation concepts

Introduction to SAP S/4HANA Supply Chain Planning < 8%

Outline both motivation and background of SAP S/4HANA, describe its main components, the lines of business, and the SAP User Experience strategy.

Master Data in SAP S/4HANA > 12%

Identify and explain production relevant master data, including, but not limited to: bill of material, routing and production version.


 

Achieve the C-TS422-2021 Exam Best Results with Help from SAP Certified Experts: https://www.exam-killer.com/C-TS422-2021-valid-questions.html

Give You Free Regular Updates on C-TS422-2021 Exam Questions: https://drive.google.com/open?id=1VfA2C7EctfVImHYPhrOvgkqDgFAm276t